The Central Project Office plays a vital role in improving construction efficiency for the large-scale landmark project atop High-Speed Rail West Kowloon Terminus, a cluster of commercial buildings scheduled for completion in 2025.The office covers approximately 7,000-square-feet with the capacity to accommodate over 60 people, it’s also connected to the construction site office which effectively saves the time of the team to go back and forth between the site and the office building. The CPO breaks the simple and dull images of a traditional site office, the design creates a flexible, green, and comfortable working environment with a modern and contemporary touch.
CAN adopts a responsive and human-centered design to create a functional workplace for employees, a comfortable, fresh, and flexible office environment that improves productivity, collaboration, and creativity. Introducing the office of the future, the design is based on a flexible open plan, with multiple semi-open meeting spaces and causal social spaces of different sizes to increase communication between teams. The CPO plays an important role as a circulation hub, the collaboration and interaction between teams have become the focus of the design, and the fluidity in the environment facilitates communication and idea-sharing to ensure the smooth operation of the whole office.